some areas, the boardwalk is at grade on       with the South Chickamauga Alliance, a        section. During early route planning, the
the high/uphill side, and 30 feet high on      group that represents citizens who advocate   pathway was routed under an existing
the low/downhill side.                         for the protection, preservation, conserva-   CSX railroad and then almost immedi-
                                               tion, and improvement of the watershed.       ately over the aerial sewer crossing. In
  The sloped, heavily wooded terrain           The design team met with this organization    order to achieve the necessary clearance
presented several challenges during the        to solicit input for the project. Another     under the railway, the boardwalk was
alignment design process. There was            significant issue was proximity of the trail  driven down to an elevation which could
limited survey data locating large exist-      to the creek. The design maintains a vegeta-  not be adjusted quickly enough to avoid
ing trees, and the final trail alignment was   tive buffer and riparian zone between the     conflict of the sewer structure crossing
established in the field during construc-      creek and trail sections to minimize impact   the creek and the boardwalk. Barge Wag-
tion by the project team. This hands-on        to the land, and to protect the waterway.     goner quickly understood the constraint
process allowed for maximum flexibility        Areas of boardwalk allowed for very low-      this conflict presented for the project and
to avoid specimen hardwood trees, rock         impact clearing along the creek stream        realized that any adjustments to the ex-
bluffs, and other natural features identi-     edges and vegetation.                         isting road and bridge structure would be
fied for preservation.                                                                       cost prohibitive for the project. By using
                                                 At the present time, Barge Waggoner         an iterative design approach, Barge Wag-
  Because the trail crosses under City         has been engaged by The Trust for Public      goner rerouted the trail from underneath
streets and active railroads, these locations  Land to complete design for portions of the   the CSX crossing to a location where the
presented opportunities for creative de-       remaining 3-mile section required to final-   trail can cross the sewer. This new loca-
sign. The design under Bonny Oaks Drive        ize the connection from the River Park to     tion is at the point the sewer transitions
needed to maintain proper head clear-          Camp Jordan. This section includes similar    from the aerial crossing into the bank of
ance and keep the low chord of the bridge      characteristics and will require some of the  stream.
above the 100-year flood elevation. A          same design solutions utilized in earlier
covered walkway under a railroad protects      phases, but uniquely encounters railroad        The trail has been described by past
users from potential falling debris from       underpasses and an elevated sewer creek       users as a “walk in the trees” that al-
the tracks above, with the design offering     crossing in close proximity to each other.    lows some peaceful time away from life’s
safety combined with aesthetic appeal.         These obstructions are made more difficult    demands in an urban environment. South
                                               by steep banks on each side of the creek,     Chickamauga Creek’s transformation over
  One of the main goals was to determine       which limits viable options to maintain an    the last 20 years and its connection to
a way that traverses the difficult terrain     ADA accessible walkway.                       the Riverwalk provides the surrounding
without destroying the natural beauty                                                        community an enhanced experience that
of existing plant communities along the          The constraints in this portion of the      encourages recreation for all ages, and
creek. The elevated boardwalk provided         project have required Barge Waggoner          ultimately provides a trail system over 20
the desired accessibility with minimal im-     to perform extensive on-site reviews and      miles long from East Ridge to the foot of
pact to the existing vegetation and steep      field surveys in order to evaluate and        Lookout Mountain near downtown.
topography.                                    design a constructible, cost-effective trail

  Barge Waggoner also worked closely