Page 20 - Sept/Oct 2018 Vol 36 No 3
P. 20

2017 CONFERENCE TECHNICAL SESSION  EQ System from page 19                        from one, two, or all three of the force   staged operational scenario is in place.
                                                                                 mains to be rerouted to the EQ Basin by      Each EQ Basin’s PLC includes logic
                                   controllers (PLCs) were installed at each     actuation of a series of motor operated
                                   site with the capability to communicate       valves.                                    that determines at what point the EQ
                                   status and alarms through the city’s                                                     Basin at that particular site can be drained
                                   fiber optic system to the main PLC at         EQ Basins                                  back into the system. After a rainfall
                                   the wastewater treatment plant, receive                                                  event has passed and the flow at the
                                   commands from the main PLC, and                 The three EQ Basins were located at the  junction begins to decrease, the control
                                   control pumps and valves at the site.         East Plant pump station, the confluence    system automatically begins to empty
                                                                                 of the force mains from the East Plant     the basins on a preset, staged basis. The
                                     In conjunction with the EQ Basin            pump station and the Emory Valley pump     system is designed to empty the basins at
                                   designs, three laser flow meters were         station, and adjacent to the interceptor   a controlled rate, based on the total flow
                                   specified to be installed in manholes         from the Scarboro Basin.                   being discharged to the main interceptor.
                                   upstream of the junction to determine the
                                   flow rate being discharged to the main        The system at work                         Impact
                                   interceptor. The flow meters, installed
                                   at the three sites, collect flow data and       Control of the overall system is           The EQ system has assisted the City of
                                   transmit real-time flow measurements          accomplished by summing the flows          Oak Ridge in meeting the requirements of
                                   – via the fiber system – to the main PLC      measured by the three laser flow meters    the EPA mandate in a timely and effective
                                   at the wastewater treatment plant. The        and comparing the total to a preset        manner.
                                   East Plant and Scarboro EQ Basins were        maximum allowable flow that can be
                                   designed to operate independently based       discharged to the main interceptor. Once     Director of the City’s Department of
                                   on flows at each site or remotely based on    the total exceeds the preset maximum,      Public Works, Shira McWaters, noted,
                                   commands from the wastewater treatment        the Emory Valley EQ Basin is put into      “This project was one of many associated
                                   plant PLC. The Emory Valley EQ Basin          operation.                                 with the City of Oak Ridge’s compliance
                                   was designed to control the rate of flow                                                 mandate. It was a substantial undertaking
                                   from two major pumping stations (East           By utilizing instrumentation installed   that showed the city’s commitment to
                                   Plant and Emory Valley) by connecting         at the basin sites and the flow meters     addressing the mandate requirements,
                                   the three force mains (one from East Plant    installed in the three interceptors,       instilling confidence in our program with
                                   and two from Emory Valley) that passed        transmitting the real-time data via fiber  the regulators. Since construction, we
                                   by the site into a manifold that allows flow  to a dedicated PLC at the wastewater       have seen the design come to fruition by
                                                                                 treatment plant, and developing logic to   alleviating overflows and significantly
                                                                                 determine when and to what extent flows    improving system operations.”
                                                                                 must be re-routed to the EQ Basins, a

                                   20	 TPW September/October 2018
   15   16   17   18   19   20   21   22   23   24   25